wbaiv: 5827 Moraga House Paint picture copy 4 checkpoint
wbaiv: 5827 Moraga 3 cream garage no dark better bricks
wbaiv: Owens-Corning shingle and paint demo
wbaiv: Battery Smoke CO walls etc copy 2
wbaiv: CO detector and alarm located in garage. IMG_8007
wbaiv: Hallway at top level of stairs. IMG_8004
wbaiv: Access hatch to upper attic IMG_7947
wbaiv: R-38, 11 inches deep, lower attic IMG_7942
wbaiv: 24-Aug 23 lower attic IMG_7940
wbaiv: New OSB deck from inside, R-38 insulation24-Aug 23 IMG_7935
wbaiv: Completed wall, stairs, rail, cleaned patio, new roof!24-Aug-22 IMG_7888
wbaiv: 5827 Moraga 1
wbaiv: The whole Megillah 2024-Aug-22 IMG_7878
wbaiv: Stairs cast, forms removed, hand rail installed 24-Aug-22 IMG_7876
wbaiv: Old roof deck - Stewed valley IMG_7841
wbaiv: Old rood deck stewed plywood deck IMG_7840
wbaiv: Failed roof deck upper attic 24-Aug-15 7.pm DSC_0588
wbaiv: Failed roof deck lower attic 24-Aug-15 7.30pm DSC_0583
wbaiv: Overlap! Concrete and roofing contractors 24-Aug-15 9.50am IMG_7832
wbaiv: Stair forms 24-Aug-14 5.pm IMG_7827
wbaiv: Dirt and debris hauler 8-Aug-24 IMG_7806
wbaiv: Day 7-Aug-24 Gravel for French drain IMG_7761
wbaiv: Retaining wall forms removed IMG_7704
wbaiv: Wall forms Removed IMG_7703
wbaiv: all walls poured while project 24-Jul-31 IMG_7702 (1)
wbaiv: All walls poured 24-Jul-31 IMG_7698 (1)
wbaiv: East form no back 24-Jul 16 IMG_7539
wbaiv: Day 15 24-Jul-7 almost ready IMG_7495 (2)
wbaiv: Day 12 24-Jul-4 rebar y braces in form IMG_7447 (1)
wbaiv: Day 11 rebar base east wall IMG_7438