pholiv7: 20160919_154153
pholiv7: 20160919_154132
pholiv7: 20160919_154040
pholiv7: 20160919_154030
pholiv7: 20160919_154022
pholiv7: 20160919_154013
pholiv7: 20160919_151356
pholiv7: 20160919_151347
pholiv7: 20160919_151312
pholiv7: 20160919_151305
pholiv7: 20160919_150924
pholiv7: 20160919_132309
pholiv7: digging the hole for the tank
pholiv7: the fosse has arrived. 1.8 tonnes of concrete
pholiv7: pipes and bsllast going in
pholiv7: and a load of ballast
pholiv7: and the big digger arrives
pholiv7: trenches neatly done
pholiv7: JCB arrives to dig trenches
pholiv7: more hardware
pholiv7: hardware delivered
pholiv7: Porew supply all done
pholiv7: The electrician arrives
pholiv7: MG6 BTCC replica at Barton Marina
pholiv7: MG6 BTCC replica
pholiv7: MG6 BTCC replica
pholiv7: Spain 2014
pholiv7: Spain 2014
pholiv7: Spain 2014
pholiv7: Spain 2014