ESA_events:
AAUSAT5 inside the thermal vacuum chamber ready to start the test campaign.
ESA_events:
OUFTI-1 being inspected to ensure that no damage was present before to start the vibration test campaign.
ESA_events:
OUFTI-1 being inserted inside the TestPOD which serves as an interface between the satellite and shaker (vibration table).
ESA_events:
OUFTI-1 team mounting the TestPOD with their satellite inside on the shaker.
ESA_events:
AAUSAT5 team attaching the external thermocouples on the satellite.
ESA_events:
Close up of AAUSAT5 satellite.