ESA_events:
REM-RED preparing their experiment for communication test
ESA_events:
SCRAP doing final assemply of their FFU
ESA_events:
SCRAP inspecting their rocket mounted unit
ESA_events:
SCRAPS cartridges loaded with copper dust
ESA_events:
WUSAT preparing their FFU for flight
ESA_events:
MORABA staff helping WUSAT with their antenna
ESA_events:
PHOS student desoldering a component
ESA_events:
REM-RED team doing a vissual inspection before handing over the experiment to Eurolaunch
ESA_events:
SCRAP communication test
ESA_events:
SCRAP doing final assembly of their FFU
ESA_events:
WUSAT loading the FFU into the ejection mechanism
ESA_events:
PHOS working on their final assembly
ESA_events:
REXUS 17 payload fully integrated
ESA_events:
WUSAT tensioning their wire holding back the ejection mechanism
ESA_events:
WUSAT dismounting the FFU simulating the ejection
ESA_events:
All the students participating in the campaign
ESA_events:
Launch of REXUS 18
ESA_events:
Students investigating their experiments after flight
ESA_events:
Students waiting for launch of REXUS 17
ESA_events:
Roll out of REXUS 17