brianandstephclaus:
IMG_3801
brianandstephclaus:
IMG_3794
brianandstephclaus:
IMG_3793
brianandstephclaus:
IMG_3792
brianandstephclaus:
IMG_3791
brianandstephclaus:
IMG_3790
brianandstephclaus:
IMG_3789
brianandstephclaus:
IMG_3785
brianandstephclaus:
IMG_3782
brianandstephclaus:
IMG_3780
brianandstephclaus:
IMG_3779
brianandstephclaus:
IMG_3775
brianandstephclaus:
IMG_3772
brianandstephclaus:
IMG_3769
brianandstephclaus:
IMG_3761
brianandstephclaus:
IMG_3759
brianandstephclaus:
IMG_3758
brianandstephclaus:
Wind Turbines at the Campus (video)
brianandstephclaus:
Finished wind turbines
brianandstephclaus:
Generator assembly
brianandstephclaus:
Theo with the finished product
brianandstephclaus:
Theo and I spent over 120 hours in 6 days building these from scratch and getting them mounted on the roof. Some very long days!
brianandstephclaus:
The finished 6 foot VAWT overlooking the mountains.
brianandstephclaus:
Frame mounted and ready to go
brianandstephclaus:
Jeff & Brian bolting the frame to the i-beam. It was over a 100 degrees F in there.
brianandstephclaus:
Pulling the electrical down to the ground.
brianandstephclaus:
Working on the electrical run
brianandstephclaus:
Jeff & Ernesto bolting the frame to the large i-beam.
brianandstephclaus:
Positioning the frame to be mounted
brianandstephclaus:
Getting the frame up onto the roof