texasjimgray: 208 - Terri's Kiln
texasjimgray: 207 - Terri plasters with cookies
texasjimgray: 209 - owl sconce
texasjimgray: 210 - sconces installed
texasjimgray: 211 - island step
texasjimgray: 212 - prep for painting
texasjimgray: 213 - prepping the stairs
texasjimgray: 214 - stairs installed
texasjimgray: 206 - closet doors installed
texasjimgray: 205 - Interior front door
texasjimgray: 204 - bench
texasjimgray: 203 - bathroom windows tiled
texasjimgray: 202 - bathroom tiled
texasjimgray: 201 - baseboards installed
texasjimgray: 182 - tile baseboard in studio
texasjimgray: 191 - laundry room cabinets installed
texasjimgray: 190c - ductwork finished
texasjimgray: 181 - tile baseboards
texasjimgray: 196 - Terri puts the final coat on the relief in the studio
texasjimgray: 192 - ceiling fans installed
texasjimgray: 183 - master shower tiled
texasjimgray: 188 - trench for electric being dug
texasjimgray: 172 - house fully tarped
texasjimgray: 174 - the reveal on the South side
texasjimgray: 200 - studio with lights, doors and finished plaster
texasjimgray: 175 - the reveal in West side
texasjimgray: 178 - the final coat across the South side
texasjimgray: 177 - the final coat with 9ft door
texasjimgray: 187 - air conditioner installed
texasjimgray: 176 - the final coat with 9ft door