4thirdsOpticalDelusions:
And That Concludes Another Episode...
4thirdsOpticalDelusions:
Insulation Offcuts
4thirdsOpticalDelusions:
Wired and Ready for Insulation
4thirdsOpticalDelusions:
Slow Progress
4thirdsOpticalDelusions:
Another Year's Supply
4thirdsOpticalDelusions:
Two Hundred Forty Bottles Later
4thirdsOpticalDelusions:
Covered Junction Box
4thirdsOpticalDelusions:
Junction Box
4thirdsOpticalDelusions:
One Small Step Backwards
4thirdsOpticalDelusions:
Some Days, Some Jobs
4thirdsOpticalDelusions:
Ready for Drywall Part II
4thirdsOpticalDelusions:
Blocking Between Joists
4thirdsOpticalDelusions:
View From the Utilty Room
4thirdsOpticalDelusions:
It's Just Framing For a Closet
4thirdsOpticalDelusions:
And Yet More Framing
4thirdsOpticalDelusions:
Another Milestone
4thirdsOpticalDelusions:
The Dreaded Drywall Piece Installed
4thirdsOpticalDelusions:
The Dreaded Drywall Piece Layout
4thirdsOpticalDelusions:
It's a Start
4thirdsOpticalDelusions:
Present Heat Wave Notwithstanding
4thirdsOpticalDelusions:
Better Late Than Never
4thirdsOpticalDelusions:
Come on Daddy...
4thirdsOpticalDelusions:
Basement Framing (continued)
4thirdsOpticalDelusions:
Basement Framing Temporarily Stops
4thirdsOpticalDelusions:
An Abrupt Stop
4thirdsOpticalDelusions:
Into the Final Turn
4thirdsOpticalDelusions:
Rock Wool Insulation
4thirdsOpticalDelusions:
Basement Partition Framing
4thirdsOpticalDelusions:
Turning a Final Corner
4thirdsOpticalDelusions:
From the Cranston Herd's Point of View