walking spanish down the hall: north wall finished and drying
walking spanish down the hall: Where grafitti meets art
walking spanish down the hall: finished from the back yard
walking spanish down the hall: from the front yard
walking spanish down the hall: second coat of plaster
walking spanish down the hall: filter area for the native earth
walking spanish down the hall: 2 parts native earth, one part straw, one part native earth
walking spanish down the hall: cobbing the holes in the straw. pre-plaster
walking spanish down the hall: robbie and i putting up the first coat
walking spanish down the hall: outside cobbed pre-plaster
walking spanish down the hall: view from the back corner of the lot. note stairs
walking spanish down the hall: stuffing above doors (to be finished later)
walking spanish down the hall: door and window (with flashing)
walking spanish down the hall: 3044-topsoil slip coat test
walking spanish down the hall: slip coat test on scrap of OSB