x376: 1 hand work done
x376: 2 easy end done first
x376: 2.1 Pit frame elevated
x376: 3 Tractor work starts on the second end
x376: 4 Backhoe attachment in operation
x376: 5 pin work can now be done
x376: 6 at the controls
x376: 7 second pin area prepared
x376: 8 tractor work
x376: 9 The pins are 40 feet apart
x376: 10 the sand area will be 36 by 48 inches
x376: 11 dressing up the approach areas
x376: 12 Dirt from the woods
x376: 13 important to eliminate the wood facing the pitcher
x376: 14 Taking shape