Bill Wetzel: Patrick clamping the frame in place
Bill Wetzel: Another of Patrick welding the frame
Bill Wetzel: Patrick welding
Bill Wetzel: Patrick welding
Bill Wetzel: The thrust test rig
Bill Wetzel: Erin mount a prop on the thrust test rig
Bill Wetzel: Pat welding the frame
Bill Wetzel: Pat welding the frame
Bill Wetzel: Erin welding the frame
Bill Wetzel: Pat preparing to weld the frame as Chris and Erin watch
Bill Wetzel: Erin and Chris watching Pat weld
Bill Wetzel: Erin working on the motors
Bill Wetzel: Erin setting up the South Bend lathe
Bill Wetzel: Turning the motor cap
Bill Wetzel: Erin turning a motor cap on a 9" South Bend Lathe
Bill Wetzel: Erin soldering the motors
Bill Wetzel: Chirs and Erin Relaxing on a warm winter day while Pat brushes the frame
Bill Wetzel: Propeller shafts with flats milled to engage slot in prop
Bill Wetzel: Stack of completed motors
Bill Wetzel: Erin cutting slot in propeller on small Pratt & Whitney mill
Bill Wetzel: A dramatic shot that Pat took of the partially complete ROV
Bill Wetzel: It works!
Bill Wetzel: Caity, Craig, Chris, Erin and Bob
Bill Wetzel: The ROV floating as Chris check motor rotation direction
Bill Wetzel: An early launch gets a lot of attention
Bill Wetzel: Chris, Caity, Erin and Craig
Bill Wetzel: The software keeps Bob in the dark
Bill Wetzel: A flurry of activity
Bill Wetzel: Chris, Craig, Erin and Kevin with the ROV and mission apparatus
Bill Wetzel: Chris and Craig launching the ROV with the mission apparatus attached. Caity tends the tether as Erin looks on.