wpialumni: Design for Barbecue Station
wpialumni: Senior Class Gift Chairs with Win Priem '59
wpialumni: Construction Begins
wpialumni: Digging Continues
wpialumni: Redirecting Electrical
wpialumni: Looking Back at the Campus Center
wpialumni: Concrete Base is Poured
wpialumni: Finished Concrete Slab
wpialumni: Concrete Slab
wpialumni: Patio Area Leveled
wpialumni: A View from the Campus Center
wpialumni: Laying Down the Pavers
wpialumni: Patio Area
wpialumni: Patio Area #2
wpialumni: Patio Area Completed
wpialumni: First Level of the Wall
wpialumni: The Wall Begins
wpialumni: Level One
wpialumni: Level 2 Begins
wpialumni: Getting Closer...
wpialumni: Gift Presentation 1
wpialumni: Gift Presentation 2
wpialumni: Side View of Barbeque Station
wpialumni: Level 3 Begins
wpialumni: Almost Done with Level 3
wpialumni: Overview of Barbeque Station
wpialumni: Barbeque Station From Front
wpialumni: Level Three Complete
wpialumni: Barbeque Station Benches
wpialumni: BBQ_Oct_14_2010_1