Oran Viriyincy: Line crew platform truck
Oran Viriyincy: Pine Street partial closure
Oran Viriyincy: Line crew platform truck
Oran Viriyincy: Short circuit
Oran Viriyincy: Installing new trolley wire
Oran Viriyincy: Connection to existing line
Oran Viriyincy: Installing new trolley wire
Oran Viriyincy: Installing new trolley wire
Oran Viriyincy: Installing new trolley wire
Oran Viriyincy: Temporary support
Oran Viriyincy: Close-up of work
Oran Viriyincy: Huge spool of new copper wire
Oran Viriyincy: Installing new trolley wire
Oran Viriyincy: A Peek at the Driver's Console
Oran Viriyincy: DSC00881
Oran Viriyincy: Stranded
Oran Viriyincy: Evolution
Oran Viriyincy: MAN Articulated Trolley Bus Interior
Oran Viriyincy: Metro 7 77
Oran Viriyincy: Mount Baker Station under construction
Oran Viriyincy: Link touches down on MLK
Oran Viriyincy: MAN Articulated Trolley Bus
Oran Viriyincy: Earth Day Poster (Logo closeup)
Oran Viriyincy: More rails taking root in the Rainier Valley
Oran Viriyincy: Operating a Sounder Train (closeup)
Oran Viriyincy: Operating a Sounder Train
Oran Viriyincy: Rails taking root in the Rainier Valley
Oran Viriyincy: Madrona Park Loop
Oran Viriyincy: Enjoying a summer's afternoon on the Water Taxi
Oran Viriyincy: Buying Tickets for the Sounder