VaDOT: Looking southwest along existing Route 54 with new alignment on the left.
VaDOT: Route 54 (background) will intersect the realigned section of Route 33 (left to right) at a right angle.
VaDOT: Looking north along Route 33 at the intersection with Route 657 where the realignment of Rte 33 moves to the right.
VaDOT: Route 657 looking northwest to the intersection with Route 33.
VaDOT: Eastbound Route 33 will realign to the right before intersecting with the relocated end of Route 54.
VaDOT: Drop inlets along what will be the edge of the realigned section of Route 33.
VaDOT: Construction of a temporary travel lane requires work on the entrance to the Valero station on the corner.
VaDOT: Construction of a temporary travel lane requires work on the entrance to the Valero station on the corner.
VaDOT: Construction of a temporary travel lane requires work on the entrance to the Valero station on the corner.
VaDOT: Construction of a temporary travel lane requires work on the entrance to the Valero station on the corner.
VaDOT: Construction of a temporary travel lane requires work on the entrance to the Valero station on the corner.
VaDOT: Construction of a temporary travel lane requires work on the entrance to the Valero station on the corner.
VaDOT: Construction of a temporary travel lane requires work on the entrance to the Valero station on the corner.