Bureau of Reclamation: The first bucket of concrete was poured on October 29, 1952 in Folsom, California.
Bureau of Reclamation: AR-3211-CV American River - Folsom Powerplant. Governor Goodwin J. Knight speaking during Folsom Dam Dedication ceremonies. Central Valley Project, Region 2.
Bureau of Reclamation: AR-3055-CV American River - Folsom Powerplant--Tailrace and river channels, power plant, and dam viewed from downstream immediately after closing of upper row of outlet gates.
Bureau of Reclamation: AR-2559-CV American River - Folsom Powerplant. Powerplant and dam viewed from downstream (south side of river). Discharge from outlet gate in dam is approximately 30 cfs. Central Valley Project, Region 2.
Bureau of Reclamation: AR-2488-CV American River - Folsom Powerplant. Powerplant and dam viewed from Photo Point No. 2 (south side of river) looking upstream. Central Valley Project, Region 2.
Bureau of Reclamation: AR-2448-CV American River - Folsom Powerplant. Powerplant viewed from upstream right corner of excavation, elevation 290. Control cable tunnel at right. Note installed transformers and take-off structure. Central Valley Project, Region 2.
Bureau of Reclamation: AR-1964-CV American River - Folsom Powerplant. Aerial view of dam from upstream. Diversion tunnel inlet at lower right.
Bureau of Reclamation: AR-1822-CV American River - Folsom Powerplant. E-Line wall and penstocks viewed from downstream. Pumpcrete machine set up in portal of No.1 penstock (left center). Central Valley Project, Region 2
Bureau of Reclamation: AR-1790-CV American River - Folsom Powerplant. Powerplant viewed from downstream right side of tailrace channel excavation. Unit 3 in center. Left tailrace training wall at right center.
Bureau of Reclamation: AR-1789-CV American River - Folsom Powerplant. View looking down into powerplant from upstream right corner of excavaion (elevation 290). Workmen are readying forms and reinforement in Unit 3 (upper left) for Placement 9.
Bureau of Reclamation: AR-1751-CV American River - Folsom Powerplant. Powerplant area and dam viewed from left bank of river (photo point No. 2), looking upstream. Central Valley Project, Region 2
Bureau of Reclamation: AR-1458-CV American River, Folsom. Powerplant concrete viewed from right downsteam corner. E-line wall concrete placed to elevation 145 in Unit 2, left. Top of form in Unit 3, upper right, at elevation 145.
Bureau of Reclamation: AR-1353-CV American River. Folsom. Closeup of placement 4-A, Unit 1 of powerplant, viewed from right, westerly end. Concrete being dumped from 2-yard bucket. Delta District, Central Valley Project, Region 2.
Bureau of Reclamation: AR-1114-CV American River, Folsom. Gravity training wall viewed from left side of old river channel. top of highest forms at approximate elevation 208. Delta District, Central Valley Project, Region 2.
Bureau of Reclamation: Water release from Folsom Dam.
Bureau of Reclamation: A view of the Folsom Dam Auxiliary Spillway.
Bureau of Reclamation: A view of the Folsom Dam Auxiliary Spillway.
Bureau of Reclamation: A view of the Folsom Dam Auxiliary Spillway.
Bureau of Reclamation: Water release from Folsom Dam.
Bureau of Reclamation: On March 8, 2016, the Folsom Office released water from the Folsom Dam into the American River.
Bureau of Reclamation: On March 8, 2016, the Folsom Office released water from the Folsom Dam into the American River.
Bureau of Reclamation: The spillway includes a control structure with six submerged gates that control water releases.
Bureau of Reclamation: The Folsom Dam Auxiliary Spillway project is an approximately $900-million cooperative effort between the U.S. Army Corps of Engineers and the U.S. Department of the Interior, Bureau of Reclamation.
Bureau of Reclamation: The Folsom Dam Auxiliary Spillway project is an approximately $900-million cooperative effort between the U.S. Army Corps of Engineers and the U.S. Department of the Interior, Bureau of Reclamation.
Bureau of Reclamation: B485-800-30 Folsom Spillway
Bureau of Reclamation: B485-800-27 Folsom Spillway
Bureau of Reclamation: B485-800-24 Folsom Spillway
Bureau of Reclamation: B485-800-23 Folsom Dam
Bureau of Reclamation: B485-800-19 Folsom Dam Water Release
Bureau of Reclamation: B485-800-17 Folsom Dam Water Release