USACE HQ: Stakeholder Tour
USACE HQ: Aerial View of Howard Hanson Dam
USACE HQ: Depression Investigation
USACE HQ: Depression Excavation
USACE HQ: Depression Excavation
USACE HQ: Dam Safety Officer, Rob Romocki
USACE HQ: Chief of Engineers tours Howard Hanson Dam
USACE HQ: Congressional members visit Howard Hanson Dam, Sept. 28, 2009
USACE HQ: Monitoring Refusal
USACE HQ: Drilling Grout
USACE HQ: Seepage Barrier Construction Platform
USACE HQ: Preparing Injection Site
USACE HQ: Installing Drill Rigs
USACE HQ: Grouting Operations 24/7
USACE HQ: Congressional Visit 9-28-09
USACE HQ: Hesco Barriers are readied in the Green River Valley (Washington)
USACE HQ: Flood Defense Wall
USACE HQ: Inspecting the Operation
USACE HQ: Minimizing Impact to Critical Infrastructure
USACE HQ: 21,000 Supersax
USACE HQ: Flood Defense Barrier Installation
USACE HQ: First Temp Measure delivery arrives
USACE HQ: Reading up on Installation
USACE HQ: First Flood Risk Reduction Equipment Arrives 10-01
USACE HQ: Inspecting the first delivery of flood-fighting materials