UNevadaPhotos:
Structures Lab 1_14-16
UNevadaPhotos:
Structures Lab 1_14-15
UNevadaPhotos:
Structures Lab 1_14-14
UNevadaPhotos:
Structures Lab 1_14-10
UNevadaPhotos:
Structures Lab 1_14-1
UNevadaPhotos:
Structures Lab 1_14-4
UNevadaPhotos:
Structures Lab 1_14-5
UNevadaPhotos:
Bridge cranes
UNevadaPhotos:
Cranes in action
UNevadaPhotos:
Structures Lab 1_14-27
UNevadaPhotos:
Structures Lab 1_14-24
UNevadaPhotos:
Underside of laboratory floor
UNevadaPhotos:
Hydraulic hardline ports feeding a service manifold
UNevadaPhotos:
Temporary hydraulic hardline
UNevadaPhotos:
3D rendering of a section of the test floor.
UNevadaPhotos:
testfloorplan
UNevadaPhotos:
Laboratory floor showing Dywidag tie-down
UNevadaPhotos:
Basement blow-downs and accumulators for the biaxial shake tables
UNevadaPhotos:
Experiment prep area in the basement
UNevadaPhotos:
North-side roll up door
UNevadaPhotos:
East-side roll-up door
UNevadaPhotos:
Roll-up door at south end of lab
UNevadaPhotos:
Access ramp to basement on north end of lab
UNevadaPhotos:
Staging Area, North
UNevadaPhotos:
Horizontal actuator attached to buttress
UNevadaPhotos:
Load buttress assembled from seven reaction blocks
UNevadaPhotos:
Reaction block form