goingslowly:
Oven Delivery
goingslowly:
Tara Making Kitchen Cabinets
goingslowly:
Kitchen Cabinets in Process
goingslowly:
Tara Drilling Pocket-Holes in Kitchen Sink Cabinet
goingslowly:
Tara Assembling Kitchen Sink Cabinet
goingslowly:
Off Grid Hot Water: On-Demand Propane Hot Water Heater + Shurflo Pump + 4 Gallon Pressure Tank
goingslowly:
Tara Measuring Kitchen Sink Cabinet
goingslowly:
Tyler Drilling Holes for Kitchen Sink Cabinet
goingslowly:
Tyler Working on Cottage Plumbing
goingslowly:
Tyler Testing Off Grid Cottage Plumbing
goingslowly:
Tyler Testing Off Grid Cottage Plumbing
goingslowly:
Tara Testing Off Grid Cottage Plumbing
goingslowly:
Rich Converting Range Jets to Propane
goingslowly:
Rich After Completing Propane Range Installation
goingslowly:
Tyler Testing On-Demand Propane Hot Water
goingslowly:
Strawbale Cottage Kitchen Sink Cabinet In Progress
goingslowly:
Making Face Frame for Kitchen Sink Cabinet
goingslowly:
Tara Assembling Kitchen Cabinet Face Frame
goingslowly:
Tyler Installing Kitchen Sink Facuet in Temporary 2x4
goingslowly:
Building Kitchen Cabinet Doors
goingslowly:
Drilling Pocket Holes For Kitchen Cabinet Door
goingslowly:
Tyler Installing Kitchen Sink Drain
goingslowly:
Kitchen Sink Drain w/ Plumbers Putty
goingslowly:
Paint Samples for Kitchen Cabinets
goingslowly:
Strawbale Cottage Kitchen in Progress
goingslowly:
Tyler Measuring Kitchen Cabinet for Door Hinge Placement
goingslowly:
Tara Drilling Hole for Kitchen Cabinet Door Hinge
goingslowly:
Tara Building Kitchen Cabinet
goingslowly:
Painting Kitchen Cabinet Doors
goingslowly:
Kitchen Window View After Snowfall