tlkativ: our half bath in November 2005
tlkativ: our half bath in October 2011
tlkativ: Eric had to cut around the pipes to get the cabinet out
tlkativ: bathroom after vanity was removed
tlkativ: kitchen - from living room
tlkativ: kitchen - from side entrance
tlkativ: kitchen - breakfast area
tlkativ: repainting the kitchen
tlkativ: kitchen - breakfast area repainted
tlkativ: kitchen - from side entrance repainted
tlkativ: side door, day 3
tlkativ: side door, day 1
tlkativ: living room, day 3
tlkativ: that's just not right...
tlkativ: living room, day 2
tlkativ: side door, day 4
tlkativ: hallway with bamboo flooring
tlkativ: kitchen - breakfast area with new floors
tlkativ: kitchen - from the living room with new floors!
tlkativ: the gutted half bathroom
tlkativ: half bathroom - primed and painted behind the new water saver toilet
tlkativ: quartz countertops
tlkativ: kitchen - from side entrance with new countertops
tlkativ: fancy new t-drain for the kitchen sink
tlkativ: under the sink (before)
tlkativ: first round of stripes in the half bath
tlkativ: striped wall detail
tlkativ: before backsplash goes in
tlkativ: Backsplash in progress
tlkativ: a small workspace