Vincent Ma: Time to drill the holes for the screws of the bar of the glass enclosure.
Vincent Ma: The drill makes a horrible high-pitch noise but at least no smoke..
Vincent Ma: Two holes on each side..
Vincent Ma: The suction cups on the glass handles makes pretty patterns. :)
Vincent Ma: The last hole is almost done.
Vincent Ma: Here's the flange put on top of the floor tiles.
Vincent Ma: Casing for the door.
Vincent Ma: A nicer way to terminate the baseboard trim.
Vincent Ma: Toilet installed!
Vincent Ma: 110lb+ glass pane moved down to the basement.
Vincent Ma: Wall framing is done
Vincent Ma: The shower stall is fully framed.
Vincent Ma: All the wonderboards are up..
Vincent Ma: Starting to tape the corners.
Vincent Ma: A panorama.
Vincent Ma: The vanity and mirror are in.
Vincent Ma: Shower stall ceiling has been painted.
Vincent Ma: Floor grout is applied.
Vincent Ma: The tile clips are removed.
Vincent Ma: Charcoal grout is applied (and the excess washed off)
Vincent Ma: The floor tiles are in.
Vincent Ma: My clamps can be reversed to be spreaders.
Vincent Ma: The 3rd wall of the shower stall is tiled.
Vincent Ma: A new product that helps you make sure tiles line up..
Vincent Ma: This small little 3.5" x 1.5" space..