Thagirion3:
The start of the project
Thagirion3:
One foot hold
Thagirion3:
Mixing the concrete
Thagirion3:
Setting the post
Thagirion3:
Waiting for the concrete to dry
Thagirion3:
Post painted
Thagirion3:
Measuring the frame
Thagirion3:
Frame built
Thagirion3:
Frame painted
Thagirion3:
Frame ready to install
Thagirion3:
Frame installed
Thagirion3:
Roof installed
Thagirion3:
Hooks installed.
Thagirion3:
Close up of the hooks
Thagirion3:
Nepenthes hanging around
Thagirion3:
Sorath the sun god outline
Thagirion3:
Budgie in a bad place