tanfield.railway:
20190108_IC_IMG_Crossing nose in position
tanfield.railway:
With a hand from Steve_B
tanfield.railway:
At sunset, Ian aligning the panels_B
tanfield.railway:
160 feet laid with Rob tidying_B
tanfield.railway:
finishing bufferstop in carriage shed
tanfield.railway:
offloading track panels
tanfield.railway:
installing track panels
tanfield.railway:
20190115_145225b
tanfield.railway:
20190110_141557b
tanfield.railway:
Ian moving the Muscleman_B
tanfield.railway:
20190115_143716b
tanfield.railway:
20190116_095415b
tanfield.railway:
20190116_142725b
tanfield.railway:
ET New ofloading siding
tanfield.railway:
ET New ofloading siding
tanfield.railway:
ET New ofloading siding
tanfield.railway:
East Tanfield
tanfield.railway:
East Tanfield
tanfield.railway:
East Tanfield
tanfield.railway:
Colin and Ian working on the direction indicator_B
tanfield.railway:
Placed in a 5 feet deep hole_B
tanfield.railway:
Signal being raised_B
tanfield.railway:
Loading a signal post_B
tanfield.railway:
East Tanfield
tanfield.railway:
ET approach signal hoisted into position_B