size4riggerboots:
Fwd mooring stations
size4riggerboots:
Sending the heaving line ashore, Holyhead
size4riggerboots:
Linesmen, Holyhead
size4riggerboots:
Linesmen, Holyhead
size4riggerboots:
Mooring ops fwd, Holyhead
size4riggerboots:
Fwd mooring gear
size4riggerboots:
Motorbikes are secured with speed lashings
size4riggerboots:
Plenty of paint
size4riggerboots:
A "drop" secured, chain and bar lashings
size4riggerboots:
Ready to load cargo, Holyhead
size4riggerboots:
The OOW is always in charge of loading
size4riggerboots:
Main deck hold
size4riggerboots:
Happy engineers!
size4riggerboots:
An engineer!
size4riggerboots:
Switchboard room
size4riggerboots:
Fire pumps
size4riggerboots:
Purifier room
size4riggerboots:
A sign left from the build!
size4riggerboots:
ECR
size4riggerboots:
Rescue boat
size4riggerboots:
Loading cargo, Holyhead
size4riggerboots:
Loading cargo, Holyhead
size4riggerboots:
Stern door ramp, Holyhead
size4riggerboots:
"Fingers" Lowering to meet aft ramp, Holyhead
size4riggerboots:
Aft mooring gear
size4riggerboots:
Bow doors open, discharging cargo, Dublin
size4riggerboots:
A very happy Port Authority man, Dublin
size4riggerboots:
Discharging from the bow, Dublin
size4riggerboots:
Loading commences
size4riggerboots:
Raising the loaded mezanine deck