David Saul: Chainstay mitering fixture. No more of these for a while. They take way too long to make with manual machining. #framebuilding #machining
David Saul: Chainstay fixture. #framebuilding #machining
David Saul: Chainstay fixture. #framebuilding #machining
David Saul: 20150820_191838
David Saul: 80/20 standoff mount #framebuilding #framejig
David Saul: I had an idea for an 80/20 standoff. #framebuilding #framejig
David Saul: 80/20 standoff mount. #framebuilding #framejig
David Saul: Frame jig parts heading to Australia. #framebuilding #framejig #machining
David Saul: Tubing butt gauges are done. At least two of these are available if anyone is interested.
David Saul: Finished up a pair of these tubing butt gauges today. #framebuilding #machining
David Saul: 8020 bottom bracket mount ver. 2.0
David Saul: Bottom bracket mount
David Saul: Bringheli front end
David Saul: Making small things today.
David Saul: Standoffs for the Bringheli front end.
David Saul: Standoffs for the Bringheli front end.
David Saul: More chunks of metal. Heading to a new home in Illinois.
David Saul: Head tube lower puck and upper cone for Bringheli or any jig with ¾" rod.
David Saul: More parts heading out the door. These are going to Nebraska.
David Saul: Bringheli front end on the jig.
David Saul: Seat tube plug
David Saul: 8020 bottom bracket mount
David Saul: BOTTOM BRACKET CUPS
David Saul: 34/44mm head tube puck and cone. These are available for sale.
David Saul: Bringheli lower head tube puck