St. Thomas Aquinas (Ames, IA):
Cleaning figures on Story Wall
St. Thomas Aquinas (Ames, IA):
Preparing to apply texture to Daily Mass Chapel ceiling
St. Thomas Aquinas (Ames, IA):
Working on top of scaffolding
St. Thomas Aquinas (Ames, IA):
Installing drywall at ceiling
St. Thomas Aquinas (Ames, IA):
New insulation installed
St. Thomas Aquinas (Ames, IA):
Damage (smoke) at 2nd floor pathway[b][i]
St. Thomas Aquinas (Ames, IA):
Location of fire
St. Thomas Aquinas (Ames, IA):
Cleaning offices and replacing ceiling tiles
St. Thomas Aquinas (Ames, IA):
Cleaning library and books
St. Thomas Aquinas (Ames, IA):
Cleaning meeting rooms
St. Thomas Aquinas (Ames, IA):
Ice blasting brick to remove soot
St. Thomas Aquinas (Ames, IA):
Getting ready for more ice-blasting of bricks
St. Thomas Aquinas (Ames, IA):
Scaffolding arrives
St. Thomas Aquinas (Ames, IA):
Reconciliaton Room ceiling damaged from water used on fire
St. Thomas Aquinas (Ames, IA):
After the Fire
St. Thomas Aquinas (Ames, IA):
Windows at point of fire replaced
St. Thomas Aquinas (Ames, IA):
Opening to the "dancefloor" 8' work area below ceiling
St. Thomas Aquinas (Ames, IA):
Soot at top of Story Wall
St. Thomas Aquinas (Ames, IA):
Applying acoustic ceiling
St. Thomas Aquinas (Ames, IA):
"Dance Floor"
St. Thomas Aquinas (Ames, IA):
Acoustic texture being applied
St. Thomas Aquinas (Ames, IA):
After the Fire
St. Thomas Aquinas (Ames, IA):
After the Fire
St. Thomas Aquinas (Ames, IA):
Below roof
St. Thomas Aquinas (Ames, IA):
All ceiling wood sprayed with Kiltz
St. Thomas Aquinas (Ames, IA):
After the Fire
St. Thomas Aquinas (Ames, IA):
Scaffolding in place - ceiling texture contains asbestos and all to be removed
St. Thomas Aquinas (Ames, IA):
Ceiling complete over balcony - scaffolding removed
St. Thomas Aquinas (Ames, IA):
Halo light above altar being re-installed
St. Thomas Aquinas (Ames, IA):
Processional Pathway