St. Thomas Aquinas (Ames, IA): Cleaning figures on Story Wall
St. Thomas Aquinas (Ames, IA): Preparing to apply texture to Daily Mass Chapel ceiling
St. Thomas Aquinas (Ames, IA): Working on top of scaffolding
St. Thomas Aquinas (Ames, IA): Installing drywall at ceiling
St. Thomas Aquinas (Ames, IA): New insulation installed
St. Thomas Aquinas (Ames, IA): Damage (smoke) at 2nd floor pathway[b][i]
St. Thomas Aquinas (Ames, IA): Cleaning offices and replacing ceiling tiles
St. Thomas Aquinas (Ames, IA): Cleaning library and books
St. Thomas Aquinas (Ames, IA): Cleaning meeting rooms
St. Thomas Aquinas (Ames, IA): Ice blasting brick to remove soot
St. Thomas Aquinas (Ames, IA): Getting ready for more ice-blasting of bricks
St. Thomas Aquinas (Ames, IA): Scaffolding arrives
St. Thomas Aquinas (Ames, IA): Reconciliaton Room ceiling damaged from water used on fire
St. Thomas Aquinas (Ames, IA): Windows at point of fire replaced
St. Thomas Aquinas (Ames, IA): Opening to the "dancefloor" 8' work area below ceiling
St. Thomas Aquinas (Ames, IA): Soot at top of Story Wall
St. Thomas Aquinas (Ames, IA): Applying acoustic ceiling
St. Thomas Aquinas (Ames, IA): Acoustic texture being applied
St. Thomas Aquinas (Ames, IA): All ceiling wood sprayed with Kiltz
St. Thomas Aquinas (Ames, IA): Scaffolding in place - ceiling texture contains asbestos and all to be removed
St. Thomas Aquinas (Ames, IA): Ceiling complete over balcony - scaffolding removed
St. Thomas Aquinas (Ames, IA): Halo light above altar being re-installed
St. Thomas Aquinas (Ames, IA): Processional Pathway