slworking2:
Post-tension slab?
slworking2:
Natural gas outlet for the new range has been installed
slworking2:
Plumbing for the sink has been rerouted
slworking2:
Trench has been cut in the slab
slworking2:
"Ironwood. 1220 #23" People who prepared the old kitchen cabinets for shipping to the construction site decided to get creative
slworking2:
Everything but the kitchen sink?
slworking2:
Starting to run the electrical conduit through the trench in the slab
slworking2:
Bubbles
slworking2:
Chilcote P-1220 REV #23
slworking2:
Drywall is installed
slworking2:
Drywall is installed
slworking2:
Getting the dryall installed and patched
slworking2:
Getting the dryall installed and patched
slworking2:
Blast from the past: Here's what the kitchen used to look like - back when we bought the house in 2003
slworking2:
Walls and ceiling have been taped, mudded, and textured. Pic 3
slworking2:
Walls and ceiling have been taped, mudded, and textured. Pic 4
slworking2:
Walls and ceiling have been taped, mudded, and textured. Pic 2
slworking2:
Walls and ceiling have been taped, mudded, and textured
slworking2:
Primed the ceiling. Will paint tomorrow
slworking2:
New cabinets have arrived!
slworking2:
Ceiling is painted!
slworking2:
Installing the new cabinets
slworking2:
Installing the new cabinets
slworking2:
Installing the new cabinets
slworking2:
Installing the new cabinets
slworking2:
Another view of the kitchen cabinet installation progress
slworking2:
And still more kitchen cabinet installation
slworking2:
More kitchen cabinet installation
slworking2:
Kitchen cabinet installation progress
slworking2:
Making progress on the kitchen cabinets