shyzaboy: Phase 1: Ratchet straps and tubing...
shyzaboy: Phase 1: RTD in place
shyzaboy: Phase1: Insulated lid...
shyzaboy: Phase 1: Testing
shyzaboy: Phase 1: Ineffective pump...
shyzaboy: Phase 1: Thermal reserve - too small!
shyzaboy: Phase 1: Insulation in place!
shyzaboy: Phase 1: Actually in use!
shyzaboy: Phase 2: Stabilizing the coil...
shyzaboy: Phase 2: Attempting to tighten the coils...
shyzaboy: Phase 2: Yet another mistake...
shyzaboy: Phase 2: Shiming to cover up poor execution...
shyzaboy: Phase 2: Crappy soldering...
shyzaboy: Phase 2: Bad decisions have repercussions...
shyzaboy: Phase 2: Heat transfer paste (thermal paste)
shyzaboy: Phase 2: A little too runny...
shyzaboy: Phase 2: Less precise placement...
shyzaboy: Phase 2: Plastic wrap to hold in the thermal paste...
shyzaboy: Phase 2: Insulation back in place!
shyzaboy: Phase 2: Almost finished!
shyzaboy: Phase 2: The "new" pump
shyzaboy: Phase 2: New reservoir, awaiting additional antifreeze
shyzaboy: Phase 2: Bulkheads into the freezer
shyzaboy: Phase 2: It's all about leverage...
shyzaboy: Phase 2: PID controller
shyzaboy: Phase 2: Ready for testing!
shyzaboy: Design complete? Ready to brew!
shyzaboy: Phase 2a: Coolant reservoir "upgrade"
shyzaboy: Phase 2: Fermentation in progress!
shyzaboy: Phase 2a: additional insulation