roelboom: 02 - sawing the filter to the right size
roelboom: 01 - sawing the filter to the right size 2
roelboom: 03 - First IR filter cut out
roelboom: 05 - 2 filters the left one was used
roelboom: 04 - sand grinding it to exact size
roelboom: 06 - quality control
roelboom: 07 - Prepared for the disassembly of the D200
roelboom: 08 - Removal of the back cover
roelboom: 09 - Unsoldering the ground connection
roelboom: 10 - Main board and sensor board
roelboom: 11 - Main board and sensor board removed
roelboom: 12 - All the parts
roelboom: 13 - Removing the hotmirror in the cleanroom
roelboom: 14 - Assembly of the D200
roelboom: 15 - soldering the ground connection
roelboom: 16 - Closing up the D200
roelboom: 17 - The first IR picture looked like this
roelboom: 18 - A job well done