Rock The Bike: Bamboo running boards complete.
Rock The Bike: Go to town with the self-drilling screws.
Rock The Bike: Clamp the board in place.
Rock The Bike: Use a forstner bit to recess the heads of the screws.
Rock The Bike: Checking positioning.
Rock The Bike: Cut two holes near each other for strap to pass through.
Rock The Bike: Trim with a jig saw.
Rock The Bike: Location chose for straps of GoGetter bag.
Rock The Bike: Use Tung oil to waterproof unfinished surfaces of running boards.
Rock The Bike: Sand to fix imperfections of the jig saw cut.
Rock The Bike: Cut it out!
Rock The Bike: Trace the Mundo's side loaders.