stibz6060: Ravensthorpe TRU work. 25.6.24
stibz6060: River Calder crossing area. 25.6.24
stibz6060: Ravensthorpe, Old PS Tip. 24.6.24
stibz6060: Ravensthorpe TRU works east. 25.6.24
stibz6060: Ravensthorpe-Viaduct- ( Baker Viaduct) TRU
stibz6060: Ravensthorpe-Viaduct-2
stibz6060: Mining Mitigation Ravensthorpe TRU
stibz6060: Mirfield Station June 2024
stibz6060: Heaton Lodge excavations .
stibz6060: Heaton Lodge. (new track update) 18th June
stibz6060: Baker Vidaduct piling
stibz6060: Baker Viaduct (east}
stibz6060: Baker Viaduct update 02.06.24
stibz6060: Baker Viaduct (west)update 02.06.24
stibz6060: Looking East, Heaton Lodge, May 2024
stibz6060: Looking west, Heaton Lodge. May 25, 2024
stibz6060: Heaton Lodge Cottages Before & After.
stibz6060: Healey Mills. May 2024.
stibz6060: Heaton Lodge TRU work.
stibz6060: 66761 with 6G90 Engineers train. passing TRU works.
stibz6060: Water Works bridge. May 2024. Will be 4 track here
stibz6060: Waterworks bridge Looking east, May 2024
stibz6060: 66732 with 6G90 Engineers train.
stibz6060: Sheep on the track, Royston Junction today. Sand Train Due.
stibz6060: TRU Dewsbury
stibz6060: Towards Ravensthorpe. Baker Viaduct location.
stibz6060: Ravensthorpe TRU update. April 2024.
stibz6060: Mining Mitigation at Ravensthorpe
stibz6060: Heaton Lodge West 03.04.24
stibz6060: Heaton Lodge, looking East toward Mirfield.