JD and Beastlet:
Diaphragm plate
JD and Beastlet:
Bolts removed
JD and Beastlet:
Under the diaphragm
JD and Beastlet:
The diaphragm
JD and Beastlet:
6-32 tap and bit
JD and Beastlet:
Held for drilling
JD and Beastlet:
Angled for tapping
JD and Beastlet:
Tapped
JD and Beastlet:
Pressure fitting in
JD and Beastlet:
JB Weld ready
JD and Beastlet:
Surface to be roughened
JD and Beastlet:
Surface roughened
JD and Beastlet:
JB Welded - 01
JD and Beastlet:
JB Welded - 02
JD and Beastlet:
JB Welded - 03
JD and Beastlet:
JB Welded - 04
JD and Beastlet:
JB Welded - 05
JD and Beastlet:
JB Welded - 06
JD and Beastlet:
Clamped for grinding
JD and Beastlet:
JB Weld set and sanded
JD and Beastlet:
Cleaning out the bore
JD and Beastlet:
Ground flush
JD and Beastlet:
Ground flush - another view
JD and Beastlet:
Test fit
JD and Beastlet:
Test fit - another view
JD and Beastlet:
Metering cover reinstalled
JD and Beastlet:
On the engine
JD and Beastlet:
On the engine - closer
JD and Beastlet:
Grommet oreo with icing
JD and Beastlet:
9/32" hole for grommet