JD and Beastlet:
Pushrod join test
JD and Beastlet:
The Pulse 125 is home!
JD and Beastlet:
Elevator control horn, thicker wire visible
JD and Beastlet:
Three tubes - rudder, elevator, FM antenna
JD and Beastlet:
Horizontal stabilizer, control horn removed
JD and Beastlet:
Elevators taped - thicker wire visible
JD and Beastlet:
Pin vise
JD and Beastlet:
The existing holes
JD and Beastlet:
A bin for the small parts
JD and Beastlet:
First hole marked, other side
JD and Beastlet:
The accessory parts (so far)
JD and Beastlet:
First hole drilled
JD and Beastlet:
Control horns
JD and Beastlet:
Separate horn from shoe
JD and Beastlet:
Box open
JD and Beastlet:
Second and third holes marked
JD and Beastlet:
Fitting the horn
JD and Beastlet:
Lesson learned - pre-thread the back plates
JD and Beastlet:
Both horns installed
JD and Beastlet:
Backplate detail. Will add nuts.
JD and Beastlet:
In the stand
JD and Beastlet:
3 sections to remove for push rod upgrades
JD and Beastlet:
FM antenna exit
JD and Beastlet:
All sections removed
JD and Beastlet:
2-56 tubes
JD and Beastlet:
Extra tube supports
JD and Beastlet:
More tube supports
JD and Beastlet:
holes enlarged - looking forward - comments
JD and Beastlet:
Bulkheads - comments
JD and Beastlet:
First bulkhead after servo tray - looking aft - comments