Reference Laboratory: Adamson E15 new rigging point
Reference Laboratory: Anchoring the rigging frame to the first of four Adamson E15 loudspeaker clusters
Reference Laboratory: Adamson E15 (Energia Project) line erray (flying vertical configuration)
Reference Laboratory: Termoli-20120522-00476
Reference Laboratory: IMG-20120522-00474
Reference Laboratory: Adamson E15 - Lifting up the array
Reference Laboratory: Adamson E15 on dolly
Reference Laboratory: Adamson E15 rigging frame
Reference Laboratory: Attaching rigging frames to chain motor
Reference Laboratory: Adamson E15 cluster combined with Axys Y18-12 each truss tower
Reference Laboratory: Adamson E15 - Listening session (22 May 2012, Termoli - Italy,)
Reference Laboratory: Adamson E15 - Ready for the listening test
Reference Laboratory: Adamson E15 (Energia Project beta I test) - Lombardi's team just after the listening test