Robin Dickson 1: Site of the new East Linton Station. Shrubbery clearance on Memorial Park side of the line on 30 July 2020.
Robin Dickson 1: East Linton Station site showing signs of initial piling work. Shot taken from Memorial Park, East Linton, on 21 March 2022.
Robin Dickson 1: East Linton station site, 21 May 2022. Access road from Memorial Park. First platform sections on right side of picture.
Robin Dickson 1: East Linton station site, 21 May 2022. Trackside, south bound, first platform slabs laid.
Robin Dickson 1: East Linton station site, 21 May 2022. Trackside, south bound, first platform slabs laid at underpass.
Robin Dickson 1: East Linton station site, 21 May 2022. Trackside, north bound, first platform slabs laid.
Robin Dickson 1: East Linton station site, 21 May 2022. Trackside, north bound, first platform slabs laid. The southbound train is LNER Azuma set 801202 operating service 1E12 to London from Edinburgh.
Robin Dickson 1: East Linton station site, 21 May 2022. Trackside, north bound, platform slabs sored waiting to be laid.
Robin Dickson 1: East Linton station site, 24 May 2022. Looking north from existing footbridge which is located near the long closed station, the new platform is coming into view.
Robin Dickson 1: East Linton station site, 24 May 2022. Trackside, north bound, more platform slabs laid.
Robin Dickson 1: East Linton station site, 24 May 2022. Trackside, south bound, more platform slabs laid.
Robin Dickson 1: East Linton station site, 24 May 2022. Trackside, north bound, more platform slabs laid. The Cross Country Voyager 22119 is operating service iV60 from Aberdeen, 8.20, to Plymouth, 19.46.
Robin Dickson 1: East Linton station site, 31 May 2022. Trackside, south bound, new gantries erected.
Robin Dickson 1: East Linton station site, 31 May 2022. Trackside, north bound, new gantries erected and stabilizers to existing gantry.
Robin Dickson 1: East Linton station site, 11 June 2022. Trackside, southbound, Old gantries partially dismantled and trains operating under new gantries. The southbound train is LNER Azuma set 801211 operating service 1E18 to London from Edinburgh.
Robin Dickson 1: East Linton station site, 13 June 2022. Trackside, north bound, completion of platform slabs laid. New overhead gantries in operation and old gantries removed. Trackbed ballast work carried out. Erection crane being dismantled.
Robin Dickson 1: East Linton station site, 13 June 2022. Trackside, south bound, completion of platform slabs laid. New overhead gantries in operation and old gantries removed.
Robin Dickson 1: East Linton station site, 13 June 2022. Trackside, north bound, completion of overhead gantries now in operation and old gantries removed. Erection crane being dismantled.
Robin Dickson 1: North bound side of the East Coast Main line showing ongoing works at the new East Linton Station site on 23 June 2022. Completed platforms and gantries with safety fencing erected on the platforms.
Robin Dickson 1: South bound side of the East Coast Main line showing ongoing works at the new East Linton Station site on 23 June 2022. Bottoming for access path now spread. Completed platforms and gantries with safety fencing erected on the platforms.
Robin Dickson 1: Azuma set 800209 operating strike day 1S05 Doncaster (08.34) to Edinburgh (11.22) passing the site of the new East Linton Station on 23 June 2022.
Robin Dickson 1: Panoramic view of the South bound side of the East Coast Main line showing ongoing works at the new East Linton Station site on 23 June 2022. Completed platforms and gantries with safety fencing erected on the platforms.
Robin Dickson 1: East Linton Station site showing piling work for footbridge and lift on the south bound side on 11 August 2022.
Robin Dickson 1: East Linton Station site showing piling work for footbridge and lift on the south bound side on 11 August 2022.
Robin Dickson 1: East Linton station site showing line of pedestrian footpath from the tunnel on the south bound side on 11 August 2022.
Robin Dickson 1: East Linton station site shot from the north bound side including site of car park and the platforms, on 11 August 2022.
Robin Dickson 1: LNER service 1E10 Azuma ex 10.00 Edinburgh to London, due 14.37, actual arrival 14.55, passes through the part built East Linton station on 11 August 2022.
Robin Dickson 1: Cross Country service 1V58 ex Edinburgh 9.03 to Penzance due 20.47 actual arrival 21.01 operated by 220013 passing through the part built East Linton Station on 11 August 2022.
Robin Dickson 1: South bound side of the new station at East Linton showing further pilings for the bridge/lifts on 26 August 2022.
Robin Dickson 1: South bound side of the new station at East Linton showing further work on the pedestrian access path on 26 August 2022.