A.J.____: 2" wire entrance
A.J.____: Gonna give this several more coats of paint. Once it's in the ground, that's it.
A.J.____: 2" wire entrance
A.J.____: Test fitting the mounting hardware
A.J.____: Drilled out the 2" opening
A.J.____: Drilled out the 3/4" mounting bolt holes
A.J.____: Marking out spots for holes
A.J.____: Pilot holes
A.J.____: Pilot hole
A.J.____: Testing the stanchion on the base
A.J.____: Bringing the base home from the fabricator
A.J.____: Deciding to go with 1" instead of 2"
A.J.____: GRS 2A testing
A.J.____: 20220824_225629
A.J.____: 20220824_224145
A.J.____: 20220824_224139
A.J.____: 20220824_224134
A.J.____: 20220824_225822
A.J.____: 20220824_225653
A.J.____: 20220824_225640
A.J.____: 20220824_225633
A.J.____: 20220824_234859
A.J.____: 20220824_233611
A.J.____: 20220824_233603
A.J.____: 20220825_003014
A.J.____: 20220824_235811
A.J.____: 20220824_235105
A.J.____: Dig site cleared and marked
A.J.____: Makeshift ladder
A.J.____: Hole dug, took a few hours! 4 feet deep, 3x3 feet wide.