playbsides:
17. cab assembled
playbsides:
16. New feet with old foot
playbsides:
15. Cabinet after de-funking and pre-interior paint
playbsides:
14. Test fitting Speaker Baffle and Grille
playbsides:
13. Cabinet De-funking
playbsides:
12. Grille Reassembled
playbsides:
11. Baffle after paint
playbsides:
10. Baffle Pre-paint
playbsides:
9. Cabinet after first stage of cleaning
playbsides:
8. cabinet before cleaning
playbsides:
7. amp after new knobs and cap repair
playbsides:
6. flipside of pan
playbsides:
5. Cap Resolder
playbsides:
4. speakers wired in series
playbsides:
3. pan removed
playbsides:
2. Deuce Back
playbsides:
1. Deuce Front
playbsides:
The finished amp - at least cosmetics.
playbsides:
The back.