Nick Sekani Tikondelwe James:
Nick and Alvar working into the dark
Nick Sekani Tikondelwe James:
Steps going over footings
Nick Sekani Tikondelwe James:
Alvar in footings
Nick Sekani Tikondelwe James:
Nick in overalls
Nick Sekani Tikondelwe James:
Depth of footings
Nick Sekani Tikondelwe James:
Footings going over manhole
Nick Sekani Tikondelwe James:
Wheel-barrow with rubble
Nick Sekani Tikondelwe James:
The bottom of the footings
Nick Sekani Tikondelwe James:
Sub-soil at the bottom of the soil
Nick Sekani Tikondelwe James:
Footings 1.2m
Nick Sekani Tikondelwe James:
The corridor
Nick Sekani Tikondelwe James:
Pipe for concrete into the footings
Nick Sekani Tikondelwe James:
Pipework through the house
Nick Sekani Tikondelwe James:
Pipe going passed the fridge
Nick Sekani Tikondelwe James:
Pipe reaching into footings
Nick Sekani Tikondelwe James:
concrete
Nick Sekani Tikondelwe James:
Two extensions in progress
Nick Sekani Tikondelwe James:
Wet concrete
Nick Sekani Tikondelwe James:
The footings filled
Nick Sekani Tikondelwe James:
Working with rubble
Nick Sekani Tikondelwe James:
Nick in overalls
Nick Sekani Tikondelwe James:
The wall before removal