Tridentman:
Stbd nacells removed.
Tridentman:
P2 control colum and instuments fitted.
Tridentman:
Number one engine outer nacelle removed.
Tridentman:
Removing S duct
Tridentman:
Yours truly Resting during cutting the S duct.
Tridentman:
Myself and MSD craine rigger.
Tridentman:
Work on removing hydraulic rams myself and MSD craine rigger
Tridentman:
Overview on works carried out on rear fuselage.
Tridentman:
Nosey shot.
Tridentman:
Hey presto...inboard flap removed.
Tridentman:
Julian with removed port flap.
Tridentman:
S duct fire wall and ducting removed.
Tridentman:
MLG doors removed
Tridentman:
Number two engine bay doors removed.
Tridentman:
Marking out areas to be cut.
Tridentman:
Removal of stab fairing panels.
Tridentman:
View from on top of the stab.
Tridentman:
Starboard flap removed.
Tridentman:
Crane holding the stab.
Tridentman:
Crane holding the stab.
Tridentman:
Stan "stropping" up the stab.
Tridentman:
Brake lines and wiring removed.
Tridentman:
Anti skid units removed.
Tridentman:
Neil taking a break on the stab.
Tridentman:
Stan and Neil on the stab.
Tridentman:
HS121 Trident 1C G-ARPO and Neil Lomax
Tridentman:
Stab removal.
Tridentman:
Stab at full defection.
Tridentman:
Stab at full deflection.
Tridentman:
Stab at full deflection.