Andrew Joslin:
The tech cord core and eyes are formed and taped
Andrew Joslin:
Stitching on the top eye
Andrew Joslin:
Stitching on the two eyes that attach to the Hitch Climber pulley
Andrew Joslin:
Stitching done, overall length 11"
Andrew Joslin:
Final taping over the top stitched eye, ready for shrink tubing
Andrew Joslin:
Shrink tubing installed
Andrew Joslin:
Finished tether
Andrew Joslin:
Detail of the legs
Andrew Joslin:
Detail of the legs and collar