NASARobonaut: Lift off of ground stanchion
NASARobonaut: Moving over to SLEEPR Baseplate
NASARobonaut: Lowering into place
NASARobonaut: Slowly lowering into place
NASARobonaut: Gently now...
NASARobonaut: Now in place
NASARobonaut: Adding the back plate
NASARobonaut: Removing the Crane
NASARobonaut: Adding struts
NASARobonaut: Adding sides
NASARobonaut: Adding more struts
NASARobonaut: Examing fit
NASARobonaut: Looking good!
NASARobonaut: Checking my mount points
NASARobonaut: SLEEPR Long Exposure
NASARobonaut: SLEEPR Long Exposure
NASARobonaut: SLEEPR Foam
NASARobonaut: SLEEPR Foam
NASARobonaut: A pillow of sorts
NASARobonaut: Getting packed
NASARobonaut: Getting packed
NASARobonaut: Foam Fit Check
NASARobonaut: SLEEPR
NASARobonaut: Front Foam Piece
NASARobonaut: Front Foam Install
NASARobonaut: Sealing R2 in place
NASARobonaut: Caged Robonaut
NASARobonaut: Last turn of the last bolt
NASARobonaut: Robot in a box!
NASARobonaut: Preparing to lift