davidb0229: Low water during dam repairs, Mother Brook, July 2013
davidb0229: Low water during dam repairs, Mother Brook, July 2013
davidb0229: Hydraulic cement on the dam wall
davidb0229: Hydraulic cement on the dam wall
davidb0229: restored wall at maintenance shop
davidb0229: restored wall at maintenance shop
davidb0229: restored wall at maintenance shop
davidb0229: Repairs to the right wall of the Centennial dam
davidb0229: Sealing of the dam
davidb0229: Nearly empty spillway
davidb0229: A wretched, stinking mess
davidb0229: Pond is re-filling above Centennial Dam
davidb0229: Nearly empty spillway
davidb0229: Partially completed wall at the Mother Brook Condos maintenance shed
davidb0229: Low water, Centennial Dam Mill Pond
davidb0229: Low Water in Milennial Dam mill pond
davidb0229: Wall reconstruction
davidb0229: Mill pond from the north side, looking upstream, as of 6/27 late afternoon.
davidb0229: Area above the dam as of 6/27/13, as seen from the north side, looking upstream.
davidb0229: Entrance to the side drains at the top of the dam.
davidb0229: Wall reconstruction
davidb0229: Wall reconstruction
davidb0229: Outflow from the dam's bottom drain
davidb0229: Water at the intake to the bottom drain valve, as of 6/27/13.
davidb0229: Mill pond, as of late afternoon 6/27/13, nearly drained (but with some inflow continuing).
davidb0229: Mill pond as it is as of 6/27/13, nearly drained.
davidb0229: High water brings trash into the tailrace
davidb0229: Initial construction work at Maintenance Shed wall
davidb0229: Initial construction work at Maintenance Shed wall
davidb0229: S12 -- Draining the Mill Pond before Work Begins