mmmmqc:
Boards hanging to dry from conformal coating
mmmmqc:
GPS units with nail polish to cover LEDs
mmmmqc:
GPS units with nail polish to cover LEDs
mmmmqc:
Sighting from first stake
mmmmqc:
Driving in 10 ft stake
mmmmqc:
Video of Paul & Ben installing a t-stake
mmmmqc:
Line of survey flags to other side of playa
mmmmqc:
Dusk on first day of build
mmmmqc:
Team Z at dusk
mmmmqc:
Assembling lighting components for Team L
mmmmqc:
Ian doing water levels
mmmmqc:
KC doing water levels
mmmmqc:
Transit
mmmmqc:
Line of t-stakes at dusk
mmmmqc:
Team Z
mmmmqc:
Water level tool
mmmmqc:
Tiff & Jonathan installing t-stake
mmmmqc:
Last t-stake installed
mmmmqc:
Line of t-stakes
mmmmqc:
Line of t-stakes
mmmmqc:
Eyeing the straight line of stakes
mmmmqc:
Video of DJ slaloming the stakes
mmmmqc:
Bending and sorting square boards
mmmmqc:
Sorting and gathering supplies in box truck for evening build
mmmmqc:
Gathering at box truck for evening build
mmmmqc:
Straightedge completed stake
mmmmqc:
Straightedge sign
mmmmqc:
Straightedge stake with lighting
mmmmqc:
Straightedge installed stakes
mmmmqc:
Bottom square board & battery pack