Mister-E:
Alex and Oleg
Mister-E:
Plumbing begins
Mister-E:
Under the floor
Mister-E:
Alex is happy that the extractor fan vent is up
Mister-E:
Thermostatic valve is mounted
Mister-E:
Radiator pipes cut into wall
Mister-E:
Joists in the walls
Mister-E:
Plumbing is finished
Mister-E:
Sub-floor is down
Mister-E:
Water resistant plasterboard is up
Mister-E:
Hole in ceiling is filled
Mister-E:
Prepare for plastering
Mister-E:
Ceiling drying out
Mister-E:
Whole room is replastered
Mister-E:
Plastering
Mister-E:
Floor plan
Mister-E:
Tanking
Mister-E:
Floor is down
Mister-E:
Most of the tiling finished
Mister-E:
Tiling and skirting
Mister-E:
Ceiling drying out after second replastering (to level)
Mister-E:
Sink is in! Painting...
Mister-E:
Lights are up
Mister-E:
Radiator is in...