MissionControl:
Phil and Grandpa disassemble the sailboard rack
MissionControl:
getting ready to pull the dock up
MissionControl:
Phil puts PVC pipe in the van
MissionControl:
Fritz inspects the situation
MissionControl:
Grandpa and Dad disassemble the sailboard rack
MissionControl:
Fritz in the van
MissionControl:
the van takes a load of lake stuff up to the house
MissionControl:
Dad and Phil carry the dock's walkway
MissionControl:
the dock, partially disassembled
MissionControl:
Dad and Phil move the dock closer to shore
MissionControl:
Rob supervises
MissionControl:
Dad and Phil carry the other part of the walkway
MissionControl:
preparing a plank ramp for the dock's main platform
MissionControl:
Grandpa watches
MissionControl:
Dad, Grandpa, Phil, and Rob
MissionControl:
see you next year, beach chair!
MissionControl:
Dad ties a rope around the dock platform
MissionControl:
the rope configuration
MissionControl:
Granddad watches the dock getting tied up
MissionControl:
Rob watches while ZT heckles
MissionControl:
Grandpa pulls a rope through the pulley
MissionControl:
the walkway's supporting barrels
MissionControl:
the dock platform with ropes and pulley
MissionControl:
our bobber tree
MissionControl:
the hoist sits in the woods for the winter
MissionControl:
the dock moves!
MissionControl:
the plank ramps are adjusted
MissionControl:
in between pulls
MissionControl:
the dock moves farther up the beach
MissionControl:
and farther