SD70MACMAN:
Initial street excavation
SD70MACMAN:
Construction staging on Jackson
SD70MACMAN:
Welding together a turnout
SD70MACMAN:
Removing wood ties from historic system
SD70MACMAN:
Excavator loading debris
SD70MACMAN:
Final excavation depth
SD70MACMAN:
Assembling a turnout and crossover
SD70MACMAN:
Looking up the turnout
SD70MACMAN:
Finished portion of crossover
SD70MACMAN:
Finished and unfinished trackslab
SD70MACMAN:
Rebar cage in track slab
SD70MACMAN:
Looking up the diverging leg
SD70MACMAN:
Elastomeric grout-encased switch machine
SD70MACMAN:
Finished track slab and concrete roadway
SD70MACMAN:
Vehicle drove into excavation
SD70MACMAN:
Drilling existing slab and installing dowel bars for trackslab pour
SD70MACMAN:
Assembling turnouts and OMF lead
SD70MACMAN:
Assembling turnout and OMF lead
SD70MACMAN:
Assembling turnout and OMF lead
SD70MACMAN:
Assembling turnout and OMF lead
SD70MACMAN:
Using a swingmaster to remove a car from track excavation
SD70MACMAN:
Civil works finished on Broadway
SD70MACMAN:
Finished segment of Broadway with bike facility
SD70MACMAN:
Covered bike signal and signage for crossing bikeway
SD70MACMAN:
Shared bus and streetcar stop
SD70MACMAN:
Painting bikeway and lanes
SD70MACMAN:
Looking north along the bikeway and guideway
SD70MACMAN:
Metro bus stop to be relocated
SD70MACMAN:
New Metro bus stop with temporary fencing
SD70MACMAN:
Broadway streetscape