Mike Garber: Overhead view of the construction site.
Mike Garber: 84" concrete pipes staged for installation.
Mike Garber: Railroad flaggers shelter.
Mike Garber: Looking west towards Clifton Forge, VA
Mike Garber: Looking east towards Richmond, VA
Mike Garber: Right end of liner 5-15-06
Mike Garber: Lower part of face 5-16-06
Mike Garber: Grouting installed liner plates 5-18-06
Mike Garber: Great Stuff sealant for grouting 5-18-06
Mike Garber: Bottom of heading 5-15-06
Mike Garber: Tunnel header 5-15-06
Mike Garber: Tunnel Face 5-18-06
Mike Garber: Bobcat loader going in the liner pipe.
Mike Garber: Plate liners installed
Mike Garber: Miners at work.
Mike Garber: The light at the end of the tunnel
Mike Garber: Mini-excavator used in tunnel
Mike Garber: Mini-excavator in tunnel
Mike Garber: Invert at start of final cleanout
Mike Garber: Dirt to be removed as excavator works it way back out of the tunnel
Mike Garber: Upstream End of Tunnel Liner
Mike Garber: Blocking pipe into position to prevent floating
Mike Garber: Aerial view of tunnel and crane for setting pipe
Mike Garber: Upstream end of concrete pipe
Mike Garber: Upstream end of carrier pipe
Mike Garber: Setting concrete pipe onto pulling tracks
Mike Garber: Concrete pipe inside tunnel liner
Mike Garber: Concrete pipe in place
Mike Garber: Concrete pipe disappearing into tunnel
Mike Garber: Concrete pipe being pulled into position