October 2015 - East Rail Maintenance Facility | D’octobre 2014 - Centre de maintenance ferroviaire de l’Est by Metrolinx
Photos
Albums
|
Groups
Favourites
|
Subscriptions
Contacts
|
Recommendations
Do you miss your pictures? Click here.
Do you have a flickr account?
Sign in!
©
Metrolinx
:
1. Storm sewer pipes waiting to be installed. They are 2.4 meters in diameter.
©
Metrolinx
:
2. Installed storm sewer pipes.
©
Metrolinx
:
3. Installation of a service line for the progressive maintenance bays.
©
Metrolinx
:
4. A concrete mud slab is installed on the ground to provide a stable and clean working surface during foundation work.
©
Metrolinx
:
5. Pouring of the mud slab prior to the paint shop building foundation work.
©
Metrolinx
:
6. Foundation work for the paint shop building.
©
Metrolinx
:
7. Formwork for the foundations of the main building.
©
Metrolinx
:
9. Foundations for the main ERMF building.
©
Metrolinx
:
10. Foundation work for the paint shop building.
©
Metrolinx
:
11. Installation of structural steel for the paint shop building.
©
Metrolinx
:
12. Installation of structural steel for the paint shop building.
©
Metrolinx
:
13. Overview of the ERMF site from the Hopkins Street bridge; looking west.
©
Metrolinx
:
14. Overview of the ERMF site from the Hopkins Street bridge; looking north-west.