Metrolinx: 1. Epoxy injection ports are drilled into the cracks in the concrete floor in the west tunnel.
Metrolinx: 2. Crack in the west tunnel floor is being sealed with epoxy.
Metrolinx: 3. Removal of interlocking brick from the walkway to the north entrance into the east tunnel.
Metrolinx: 4. Removal of interlocking brick from the walkway to the north entrance into the east tunnel.
Metrolinx: 5. Removal of tiles from the north entrance stairs to the east pedestrian tunnel.
Metrolinx: 6. Platform entrance from the east tunnel is protected for stair repair.
Metrolinx: 7. Demolition of the north entrance into the east tunnel.
Metrolinx: 8. Before and after sodablasting of interior wall of the east pedestrian tunnel.
Metrolinx: 9. The east pedestrian tunnel during sodablasting to strip off the old paint.
Metrolinx: 10. Installation of the structural steel for the new north entrance into the east pedestrian tunnel.
Metrolinx: 11. Installation of the structural steel for the new north entrance into the east pedestrian tunnel.
Metrolinx: 12. Installation of the structural steel for the new north entrance into the east pedestrian tunnel.