Metrolinx:
The 'white roof' atop the accessible parking area is complete; it reflects the sun's energy which helps keep the building cool.
Metrolinx:
Installation of the electrical conduit inside the link bridge, which will provide a direct connection between the new parking structure and the platforms.
Metrolinx:
Installation of the electrical conduit inside the link bridge, which will provide a direct connection between the new parking structure and the platforms.
Metrolinx:
The curb has been cut and removed between the hidhway 401 pedestrian bridge and the link bridge; an expansion joint will be installed in its place.
Metrolinx:
Exterior of the link bridge, which will provide a direct connection between the new parking structure and the platforms.
Metrolinx:
The curbs around the piers supporting the link bridge are complete; the link bridge will provide a connection between the parking structure and the platforms.
Metrolinx:
Benches and garbage bins have been installed in the south promenade, between the parking structure and Bayly Street.