Metrolinx: 1. Pre-ballast material is installed for the future path of the track detour.
Metrolinx: 2. Pre-ballast is ready for the future path of the track detour; rails and railway ties are waiting to be installed.
Metrolinx: Stockpiled rails to be be used to build the track detour.
Metrolinx: 4. Welded rails alongside the future track detour.
Metrolinx: 5. Preliminary railway tie alignment according to markers on the pre-ballast material.
Metrolinx: Preliminary railway tie alignment for the track detour.
Metrolinx: 7. Tie plates will be used to fasten rails to railway ties.
Metrolinx: One of the new signal masts which will be installed as part of the temporary track detour.
Metrolinx: 9. New signal mast in the foreground; habitat compensation area in the background.