Metrolinx: 1. The existing South Blair Street level crossing is now closed.
Metrolinx: 2. Rails and railway ties waiting to be installed for the track detours.
Metrolinx: 3. The subgrade is ready for the future path of the track detour.
Metrolinx: 4. Exposing communications cables for relocation.
Metrolinx: 5. Construction of site access roads and installation of a watermain.
Metrolinx: 6. Construction of site access roads and installation of a watermain.
Metrolinx: 7. Watermain pipes waiting to be installed.